Installing Landscape Timbers: Base, Drainage, Cutting and Fastening
A 6x6 is heavy enough to stay where you put it, and heavy enough that nobody wants to put it there twice. Set on a compacted, level, free-draining base and pinned to the ground, a timber bed or step will still be square in 15 years. Dropped onto the lawn and screwed to its neighbor, it will be leaning after a couple of freeze-thaw winters.
General guidance for US homeowners. Call 811 a few days before you dig or drive rebar, wear eye and hearing protection when cutting, and get any wall holding back real soil designed; many jurisdictions require a permit for taller walls. Part of the PlantMapper Landscape Timbers section.
Pre-drilled structural screws: the fastening is what keeps it square · photograph via Pexels
Before you start
Three things decide whether it stays square
Timber work does not take a mason's skill. There is no mortar, no cure time and very little you cannot undo in the first hour. What it does take is getting three things right, because all three are buried the moment the first course goes down.
They are: a firm, level base, so nothing settles unevenly or gets lifted by frost; drainage, so the wood is not sitting in water and nothing builds up behind it; and fasteners that tie the whole thing into the ground, not just to itself. Everything else on this page is detail around those three.
And plan the heavy lifting. A ground-contact 6x6 fresh from the store is wet with preservative and weighs 60 to 80 lb. Work out how the pile gets from the driveway to the back of the yard, and line up a helper. More timber projects stall over hauling than over anything technical.
What you need
Tools and materials
✓Tools
Square-point shovel, mattock and a wheelbarrow for digging out and leveling
4 ft level and a straight 2x4; a torpedo level is too short to be useful here
Stakes, mason's string and a speed square, or the 3-4-5 method for square corners
7¼ in circular saw, plus a reciprocating saw or handsaw to finish through a 6x6
Heavy cordless drill or impact driver and a long auger bit for pilot holes
Small sledgehammer (a 3 lb drilling hammer or bigger) for driving rebar
Hand tamper, or a rented plate compactor for bigger bases
Hand truck, timber dolly or a plank ramp, and a second person
Gloves, safety glasses, hearing protection and a dust mask; treated sawdust is not something to breathe
!Materials
Ground-contact timbers, plus 10 percent for cuts
Crushed gravel base (3/4 in minus, crusher run or paver base) by the bag or the cubic yard
Coarse sand or fine paver base for the leveling layer
Structural timber screws, 6 to 10 in, hex or Torx drive, coated for treated lumber
1/2 in (#4) rebar, cut to 2 to 3 ft lengths, for pinning to the ground
End-cut preservative (copper naphthenate) for every cut
Clean crushed stone and a perforated drain pipe for anything holding back soil
Filter fabric to keep soil out of the drainage stone
Fast-setting concrete mix if you are setting posts
As an Amazon Associate, PlantMapper may earn from qualifying purchases. Prices and availability are set by Amazon. A 6x6 is a two-person carry. Buy lumber tagged Ground Contact and treat every cut end before it goes down.
The practical bit
Moving timbers without hurting your back
A freshly treated 8 ft 6x6 weighs about as much as an 80 lb bag of concrete mix, is awkwardly long and has nothing to grip. A used railroad tie can be two or three times that and slick with tar. This is the part of the job that sends people to urgent care.
✓Do
Get a helper for anything bigger than a 4x6. It is not unreasonable to insist.
Use a hand truck or dolly on hard ground, or a wheelbarrow with the timber balanced across it on soft ground.
Lay a plank ramp over steps and soft lawn and slide rather than carry.
Walk them end over end for short moves: stand one on end, pivot, tip it over again.
Stack the load close to the work, on scrap blocks, off the ground and out of the way.
Wear gloves and work boots, steel-toed if you have them. Dropped timbers break toes.
!Do not
Lift alone and twist. That is the classic back injury.
Shoulder one down steps or a slope.
Leave them on the lawn for two weeks; the grass dies and the ground compacts.
Expect the delivery driver to bring them to the backyard; curbside or driveway drop is normal.
Work above a timber standing on edge and not secured.
Underestimate a used tie. Wet, tarred and full of old spikes, it can be far heavier than it looks.
The base
Preparing the base
What goes under the first course decides whether the whole thing stays level, and in cold regions whether frost can shove it around. Different projects need different amounts of prep.
Base by project. Depths are compacted gravel under the first course; go toward the deeper end on clay and in cold-winter regions.
Project
Base needed
Why
Flower bed, one course
Firm, level soil with sod removed
The load is tiny; a little settling does no harm
Vegetable bed, two or more courses
3-4 in compacted gravel with a thin leveling layer
Soil weight is real, and a bed that settles unevenly pulls its corners apart
Edging
2-3 in compacted gravel, or firm undisturbed soil
Enough to keep it from sinking under a mower wheel
Steps
4 in compacted gravel under each riser
Steps on bare soil settle unevenly, and uneven risers are the trip hazard
Bench
4 in compacted gravel under each leg or base
Point loads sink into soil
Retaining wall
6 in compacted gravel, level, in a trench
The base carries the whole wall and the soil behind it
On an existing patio or slab
Nothing, if it is sound and level
Make sure water can drain out, or it will sit under the wood
Call 811 first
Call 811 (or use your state's online request) a few business days before you dig. Utilities will mark buried gas, electric, water and cable lines for free. Driving 3 ft of rebar goes deeper than most yard work, and private lines such as power to a shed, sprinkler pipes or a septic line are not marked by 811, so find those yourself.
Strip sod and topsoil from the footprint
Grass left under a timber rots into a soft layer and the wood sinks into it unevenly. Take it off, and pull perennial weed roots such as bindweed and Bermuda grass while you can still reach them.
Dig to depth and tamp the bottom
Dig deep enough for the base plus however much of the first course you want buried. Tamp the bottom of the trench before anything goes in. A plate compactor rents cheaply from most equipment rental stores and makes short work of a bigger job.
Lay and compact the gravel in layers
Crushed gravel with fines, about 3 inches at a time, dampened and compacted between layers. A loose base settles over its first winter and takes the timbers with it.
Add a thin leveling layer
A half inch or so of coarse sand or fine paver base, raked and screeded with a straight 2x4, gives you something to bed the first course into and lets you make small adjustments without lifting timbers again and again.
Check level both ways before the first timber goes down
A 4 ft level across the width and along the length. Ten minutes here saves an hour of shimming later.
A firm, level base is what keeps the whole thing squareFasteners pre-drilled and driven flushPosts set below the frost line tie a wall into the ground
Water
Drainage: what really decides how long they last
Wood does not rot because it gets wet. It rots because it stays wet. And in any region with real winters, water that cannot drain freezes, expands and heaves. Nearly every timber failure that is not a fastening problem is a water problem.
Under the timbers
Never let them sit in a puddle
A timber laid straight onto clay in a low spot goes soft underneath within a few years, and you will not see it until the whole thing shifts.
A free-draining gravel base lets water get away from the underside
Never set timbers on a solid slab with no way for water to escape
On heavy clay or in frost country, go a little deeper with clean crushed stone
Behind a retaining wall
This is not optional
Water building up behind retained soil adds a great deal of pressure to the wall, and freezing adds more. It is the most common reason timber walls lean and fail.
At least 12 in of clean crushed stone (3/4 in drainage aggregate) right behind the wood
A 4 in perforated drain pipe at the bottom of that stone, sloped slightly
Run the pipe to daylight or a dry well on your own property; a drain that goes nowhere does nothing, and you should not dump water onto a neighbor's lot
Filter fabric between stone and soil so the stone does not clog with silt
Inside a raised bed
Leave the bottom open
A raised bed drains down into the ground below it. Block that and the bed becomes a tub.
Never line the bottom with plastic; landscape fabric or hardware cloth at most (the cloth keeps gophers and voles out)
Loosen the subsoil with a garden fork before you fill, especially on clay
On a patio or slab, add 4 in of coarse stone and leave weep gaps at the bottom
At the ends and joints
End grain soaks up water
Cut ends drink water far faster than the faces, which is why corners are usually the first part of a bed to go.
Treat every cut end with preservative before it goes in
Avoid jamming a cut end tight against wet soil where you can
Leave small gaps between timbers in a retaining wall so water can weep through instead of building up
Getting it straight
Layout and positioning
Timbers are big enough that a small error at one corner shows across the whole project.
Stake the outline and measure the diagonals
Stakes and string, then measure both diagonals of the rectangle. Equal diagonals mean it is square. If they are not, adjust before anything heavy goes down. On a bed, being half an inch out means the last corner will not close.
Set the first timber and make it perfect
Everything else takes its cue from it. Level along its length and across its width, and tap down or pack up the leveling layer until it is right. Do not move on until it is.
Work around, checking as you go
Place each timber, level it to the first, and check the corner is square before you fasten it. Errors add up: catching one now takes a minute, catching it at the fourth corner takes an hour.
Overlap the joints on upper courses
On anything two courses or taller, offset the joints in each course like brickwork so no joint runs the full height. Lapping the corners log-cabin style is much stronger and looks better.
Sink the first course where it matters
On edging and walls, setting the bottom course 1 to 2 in into the base stops it being kicked out of line and hides small bumps in the ground. On walls many builders bury the first course to about half its height.
Lean a retaining wall back into the slope
Step each course back slightly into the bank, roughly half an inch per course or about an inch per foot of height. The wall then works with gravity, and if it settles a little it still looks upright rather than tipping out.
Sawing
Cutting timbers safely and square
A 6x6 is deeper than a circular saw will cut in one pass, so almost every cut takes two to four passes. Take your time and the end will be square; rush it and you get a stepped face that never closes up at the corner.
Support the timber properly
Two sturdy sawhorses or blocks under it, with the offcut supported as well as the piece you are keeping. An unsupported offcut pinches the blade as it drops, and that is how kickback happens. Never cut a timber lying on the ground or pinned under your foot.
Mark all four faces
Use a speed square or rafter square to carry the line right around. You will cut from more than one side, and lining the second cut up with the first is what keeps the end flat.
Set the saw to full depth and cut the first face
A 7¼ in circular saw cuts about 2½ in deep. Cut cleanly along the line all the way across, then stop.
Roll the timber and repeat
Turn it to the opposite face, line the blade up with the first kerf and cut again. Two passes nearly get through a 6x6; four (one per face) cleans it up.
Finish the center with a reciprocating saw or handsaw
There will often be a small uncut core. A reciprocating saw with a long wood blade, or a sharp handsaw, finishes it in a minute, guided by the kerfs either side. A big beam saw or chain saw is an option, but a chain saw cut is rarely square.
Check used timbers for metal before every cut
Old ties and beams hide spikes, bolts and nails. Run a metal detector or magnet along the cut line, or at least inspect and probe it. Hitting steel at speed wrecks the blade and can throw the saw.
Treat the cut ends straight away
Brush end-cut preservative onto every fresh cut before the piece goes into place. Pressure treatment does not reach the center of a big timber, and the cut exposes untreated wood exactly where water collects.
Protection is not optional here. Safety glasses and hearing protection always; a dust mask whenever you cut treated lumber, and a respirator for anything creosoted. Work outdoors, upwind, and keep sawdust from blowing onto a vegetable bed or into a pond. Sweep up treated sawdust instead of leaving it on the soil, and never burn treated or creosote scraps in a fire pit or stove.
Holding it together
Fastening landscape timbers securely
There are four common methods, and they do different jobs. Most projects use two together: something that holds the courses to each other, and something that holds the whole thing to the ground.
Structural timber screws
The default for almost all timber work. Long hex- or Torx-drive screws, typically
6 to 10 in, driven through one timber into the one below or beside it. They have largely
replaced the old 10 to 12 in galvanized spikes, which still work for light edging but
loosen over time.
Best for Joining courses, corners, benches, steps, raised beds: almost everything
Sizing The screw should go through the top timber and bite at least 3 in
into the one below; for 6x6s that usually means 8 to 10 in screws
Pre-drill a clearance hole through the top piece and a smaller pilot into the
lower one. It stops splits and snapped screws
Two per joint minimum, set well in from the ends and offset from each other
so they do not follow the same grain line
Use screws rated for treated lumber; the copper in modern treatment eats
ordinary zinc-plated screws and leaves black streaks down the face
Rebar driven into the ground
The method that ties a timber structure to the earth rather than just to itself. A
length of 1/2 in (#4) rebar is driven down through a pre-drilled hole in the timber and
well into the soil below.
Best for Stopping edging, steps and low walls from sliding or creeping downhill
Lengths 2 to 3 ft is typical, with at least 12 in in undisturbed ground
Drill first with a bit slightly larger than the bar (9/16 in for 1/2 in rebar), then
drive with a small sledge
Sink the end flush or below the surface, or counterbore, so nothing sticks up
where people walk, and cap any exposed ends
Two per timber on edging and steps; more on anything holding back soil
Posts set in concrete
The proper answer for anything holding back real soil. Posts are set in concrete and
the timbers are fastened to them, so the load goes into the footing instead of into a
stack of loose wood.
Best for Retaining walls over about 1 ft, and any wall on a slope
Position Behind the timbers (hidden, on the soil side) or in front (visible,
simpler); behind looks neater but is harder to build
Spacing Typically every 4 ft or so, and at every joint
Depth A common rule is a third to half of the post in the ground, and below
your local frost line so frost cannot jack the posts up
Use ground-contact (UC4B) posts and let the concrete cure before you backfill
Brackets, threaded rod and deadmen
Useful extras rather than a main method, but each solves a particular problem
neatly.
Corner brackets Galvanized or coated angle brackets inside a raised bed corner
add a lot of stiffness for very little money
Threaded rod A length of rod right through two opposite sides of a deep bed,
with washers and nuts, stops the sides bowing out
Hidden dowels Short lengths of rebar or wood dowel locate courses neatly, but
they locate rather than fasten
Deadmen A short timber buried back into the slope at right angles, fastened
to the wall and tied to a crosspiece, resisting the push. The traditional answer for
timber retaining walls
A simple rule for most projects. Screws hold the timbers to each other; rebar or posts hold the whole thing to the ground. Screws alone make a rigid box that can still slide, tip or be lifted by frost; ground anchors alone let the courses shift against each other. Both together is what stays put.
Putting it together
The build, in order
For a typical two-course 8 by 4 ft raised bed in 6x6 timbers. Most of a day for two people, including the base.
Morning: utilities marked, layout checked
With 811 marks in place, set the string, square the corners and confirm both diagonals match before you dig.
Morning: dig out sod and topsoil
Strip sod and topsoil under the timber line and pull perennial weed roots. Dig deep enough for the base plus any burial of the first course.
Midday: base in and compacted
Crushed gravel in layers, tamped, then a thin leveling layer screeded flat. Check level both ways.
Midday: make the cuts
Cut the end timbers to length, marking all four faces and working around. Brush preservative on every cut end and let it soak in while you carry on.
Afternoon: first course down and leveled
Set the first timber perfectly, then work around, checking level and square at every corner. Pin each one to the ground with rebar.
Afternoon: second course, joints overlapped
Lap the corners over the course below, pre-drill, and drive structural screws down into the first course, two per joint, well in from the ends.
Finish: loosen the bottom, then fill
Break up the soil inside the bed with a fork so it drains, then fill. Stop about 2 in below the top of the wood so soil does not wash over the edge when you water.
On the job
The installation checklist
Fifteen checks across the build. Your ticks are saved in this browser only.
It depends on the job. A single course of flower-bed edging can sit on firm, level soil with the sod removed. Anything two courses or more, and all steps, benches and retaining, wants 3 to 6 inches of compacted crushed gravel with a thin leveling layer on top. The base stops uneven settling, and in cold regions it drains water away so frost heave has less to work with. Uneven settling is what pulls corners apart and tips steps forward.
How do you fasten landscape timbers together?
Use structural timber screws, typically 6 to 10 inches long with a hex or Torx drive, pre-drilled and driven through one timber into the next, two per joint and well in from the ends. That holds the courses to each other. Separately, drive 1/2 inch (#4) rebar down through the bottom course into undisturbed ground, or fasten to posts set in concrete, to hold the whole thing to the earth. Most projects need both. Galvanized landscape spikes work for light edging.
How do you cut a 6x6 landscape timber?
Support it on two sawhorses or blocks with the offcut supported too, square a line around all four faces, then cut with a circular saw set to full depth, one face at a time, rolling the timber and lining each cut up with the last kerf. A standard 7 1/4 inch saw cuts about 2 1/2 inches deep, so a 6x6 takes cuts from two or more sides; finish any center with a reciprocating saw or handsaw. Check used timbers for spikes first and treat every cut end.
What do you put under landscape timbers?
For anything beyond one decorative course, compacted crushed gravel (often sold as 3/4 inch minus, crusher run or paver base) with a thin leveling layer on top. It gives a firm, level bed and drains, which keeps the underside of the wood out of standing water. Do not set timbers straight onto sod, which rots and lets them sink unevenly, and do not bed them on solid concrete with nowhere for water to go.
How deep should the first course of timbers be buried?
For edging and the bottom course of a low wall, about 1 to 2 inches into the compacted base is usually enough to stop it being knocked out of line, and some builders bury the first course of a wall to half its height. There is no benefit in burying wood deeply, because more buried wood means more wood sitting in wet soil. What holds it in place is the rebar or posts, not the depth.
What screws should I use for landscape timbers?
Structural timber screws 6 to 10 inches long with a hex or Torx head, coated and rated for use in pressure-treated lumber. Pre-drill a clearance hole through the top piece and a pilot into the one below, or you may split the wood or snap screws. Avoid ordinary bright or zinc-plated screws: the copper in modern treated lumber corrodes them fast and they leave black streaks down the face.
Do I need drainage behind a timber retaining wall?
Yes, and it is the most important detail. Backfill at least 12 inches directly behind the wall with clean crushed stone, separate it from the soil with filter fabric, and run a perforated drain pipe along the base, sloped to somewhere it can actually discharge on your own property. Water trapped behind a wall adds a great deal of pressure, and in cold regions it freezes and heaves; it is the usual reason timber walls fail.
How do you stop a timber raised bed from bowing out?
Keep unbraced runs to about 6 ft, overlap the joints between courses, and screw the courses together properly. On a bed three courses or taller, or a longer run, add cross-bracing: a length of threaded rod through both long sides with washers and nuts, or a timber set across the bed below soil level. Wet soil pushes harder than people expect, and frozen soil harder still.