Landscape Timbers · Installation

Installing Landscape Timbers: Base, Drainage, Cutting and Fastening

A 6x6 is heavy enough to stay where you put it, and heavy enough that nobody wants to put it there twice. Set on a compacted, level, free-draining base and pinned to the ground, a timber bed or step will still be square in 15 years. Dropped onto the lawn and screwed to its neighbor, it will be leaning after a couple of freeze-thaw winters.

General guidance for US homeowners. Call 811 a few days before you dig or drive rebar, wear eye and hearing protection when cutting, and get any wall holding back real soil designed; many jurisdictions require a permit for taller walls. Part of the PlantMapper Landscape Timbers section.

A worker in gloves using a cordless drill to fasten heavy lumber together
Pre-drilled structural screws: the fastening is what keeps it square · photograph via Pexels
Before you start

Three things decide whether it stays square

Timber work does not take a mason's skill. There is no mortar, no cure time and very little you cannot undo in the first hour. What it does take is getting three things right, because all three are buried the moment the first course goes down.

They are: a firm, level base, so nothing settles unevenly or gets lifted by frost; drainage, so the wood is not sitting in water and nothing builds up behind it; and fasteners that tie the whole thing into the ground, not just to itself. Everything else on this page is detail around those three.

And plan the heavy lifting. A ground-contact 6x6 fresh from the store is wet with preservative and weighs 60 to 80 lb. Work out how the pile gets from the driveway to the back of the yard, and line up a helper. More timber projects stall over hauling than over anything technical.

What you need

Tools and materials

✓Tools

  • Square-point shovel, mattock and a wheelbarrow for digging out and leveling
  • 4 ft level and a straight 2x4; a torpedo level is too short to be useful here
  • Stakes, mason's string and a speed square, or the 3-4-5 method for square corners
  • 7¼ in circular saw, plus a reciprocating saw or handsaw to finish through a 6x6
  • Heavy cordless drill or impact driver and a long auger bit for pilot holes
  • Small sledgehammer (a 3 lb drilling hammer or bigger) for driving rebar
  • Hand tamper, or a rented plate compactor for bigger bases
  • Hand truck, timber dolly or a plank ramp, and a second person
  • Gloves, safety glasses, hearing protection and a dust mask; treated sawdust is not something to breathe

!Materials

  • Ground-contact timbers, plus 10 percent for cuts
  • Crushed gravel base (3/4 in minus, crusher run or paver base) by the bag or the cubic yard
  • Coarse sand or fine paver base for the leveling layer
  • Structural timber screws, 6 to 10 in, hex or Torx drive, coated for treated lumber
  • 1/2 in (#4) rebar, cut to 2 to 3 ft lengths, for pinning to the ground
  • End-cut preservative (copper naphthenate) for every cut
  • Clean crushed stone and a perforated drain pipe for anything holding back soil
  • Filter fabric to keep soil out of the drainage stone
  • Fast-setting concrete mix if you are setting posts

Gear for installing landscape timbers

Amazon picks

As an Amazon Associate, PlantMapper may earn from qualifying purchases. Prices and availability are set by Amazon. A 6x6 is a two-person carry. Buy lumber tagged Ground Contact and treat every cut end before it goes down.

The practical bit

Moving timbers without hurting your back

A freshly treated 8 ft 6x6 weighs about as much as an 80 lb bag of concrete mix, is awkwardly long and has nothing to grip. A used railroad tie can be two or three times that and slick with tar. This is the part of the job that sends people to urgent care.

✓Do

  • Get a helper for anything bigger than a 4x6. It is not unreasonable to insist.
  • Use a hand truck or dolly on hard ground, or a wheelbarrow with the timber balanced across it on soft ground.
  • Lay a plank ramp over steps and soft lawn and slide rather than carry.
  • Walk them end over end for short moves: stand one on end, pivot, tip it over again.
  • Stack the load close to the work, on scrap blocks, off the ground and out of the way.
  • Wear gloves and work boots, steel-toed if you have them. Dropped timbers break toes.

!Do not

  • Lift alone and twist. That is the classic back injury.
  • Shoulder one down steps or a slope.
  • Leave them on the lawn for two weeks; the grass dies and the ground compacts.
  • Expect the delivery driver to bring them to the backyard; curbside or driveway drop is normal.
  • Work above a timber standing on edge and not secured.
  • Underestimate a used tie. Wet, tarred and full of old spikes, it can be far heavier than it looks.
The base

Preparing the base

What goes under the first course decides whether the whole thing stays level, and in cold regions whether frost can shove it around. Different projects need different amounts of prep.

Base by project. Depths are compacted gravel under the first course; go toward the deeper end on clay and in cold-winter regions.
ProjectBase neededWhy
Flower bed, one courseFirm, level soil with sod removedThe load is tiny; a little settling does no harm
Vegetable bed, two or more courses3-4 in compacted gravel with a thin leveling layerSoil weight is real, and a bed that settles unevenly pulls its corners apart
Edging2-3 in compacted gravel, or firm undisturbed soilEnough to keep it from sinking under a mower wheel
Steps4 in compacted gravel under each riserSteps on bare soil settle unevenly, and uneven risers are the trip hazard
Bench4 in compacted gravel under each leg or basePoint loads sink into soil
Retaining wall6 in compacted gravel, level, in a trenchThe base carries the whole wall and the soil behind it
On an existing patio or slabNothing, if it is sound and levelMake sure water can drain out, or it will sit under the wood
  1. Call 811 first

    Call 811 (or use your state's online request) a few business days before you dig. Utilities will mark buried gas, electric, water and cable lines for free. Driving 3 ft of rebar goes deeper than most yard work, and private lines such as power to a shed, sprinkler pipes or a septic line are not marked by 811, so find those yourself.

  2. Strip sod and topsoil from the footprint

    Grass left under a timber rots into a soft layer and the wood sinks into it unevenly. Take it off, and pull perennial weed roots such as bindweed and Bermuda grass while you can still reach them.

  3. Dig to depth and tamp the bottom

    Dig deep enough for the base plus however much of the first course you want buried. Tamp the bottom of the trench before anything goes in. A plate compactor rents cheaply from most equipment rental stores and makes short work of a bigger job.

  4. Lay and compact the gravel in layers

    Crushed gravel with fines, about 3 inches at a time, dampened and compacted between layers. A loose base settles over its first winter and takes the timbers with it.

  5. Add a thin leveling layer

    A half inch or so of coarse sand or fine paver base, raked and screeded with a straight 2x4, gives you something to bed the first course into and lets you make small adjustments without lifting timbers again and again.

  6. Check level both ways before the first timber goes down

    A 4 ft level across the width and along the length. Ten minutes here saves an hour of shimming later.

Water

Drainage: what really decides how long they last

Wood does not rot because it gets wet. It rots because it stays wet. And in any region with real winters, water that cannot drain freezes, expands and heaves. Nearly every timber failure that is not a fastening problem is a water problem.

Under the timbers

Never let them sit in a puddle

A timber laid straight onto clay in a low spot goes soft underneath within a few years, and you will not see it until the whole thing shifts.

  • A free-draining gravel base lets water get away from the underside
  • Never set timbers on a solid slab with no way for water to escape
  • On heavy clay or in frost country, go a little deeper with clean crushed stone

Behind a retaining wall

This is not optional

Water building up behind retained soil adds a great deal of pressure to the wall, and freezing adds more. It is the most common reason timber walls lean and fail.

  • At least 12 in of clean crushed stone (3/4 in drainage aggregate) right behind the wood
  • A 4 in perforated drain pipe at the bottom of that stone, sloped slightly
  • Run the pipe to daylight or a dry well on your own property; a drain that goes nowhere does nothing, and you should not dump water onto a neighbor's lot
  • Filter fabric between stone and soil so the stone does not clog with silt

Inside a raised bed

Leave the bottom open

A raised bed drains down into the ground below it. Block that and the bed becomes a tub.

  • Never line the bottom with plastic; landscape fabric or hardware cloth at most (the cloth keeps gophers and voles out)
  • Loosen the subsoil with a garden fork before you fill, especially on clay
  • On a patio or slab, add 4 in of coarse stone and leave weep gaps at the bottom

At the ends and joints

End grain soaks up water

Cut ends drink water far faster than the faces, which is why corners are usually the first part of a bed to go.

  • Treat every cut end with preservative before it goes in
  • Avoid jamming a cut end tight against wet soil where you can
  • Leave small gaps between timbers in a retaining wall so water can weep through instead of building up
Getting it straight

Layout and positioning

Timbers are big enough that a small error at one corner shows across the whole project.

  1. Stake the outline and measure the diagonals

    Stakes and string, then measure both diagonals of the rectangle. Equal diagonals mean it is square. If they are not, adjust before anything heavy goes down. On a bed, being half an inch out means the last corner will not close.

  2. Set the first timber and make it perfect

    Everything else takes its cue from it. Level along its length and across its width, and tap down or pack up the leveling layer until it is right. Do not move on until it is.

  3. Work around, checking as you go

    Place each timber, level it to the first, and check the corner is square before you fasten it. Errors add up: catching one now takes a minute, catching it at the fourth corner takes an hour.

  4. Overlap the joints on upper courses

    On anything two courses or taller, offset the joints in each course like brickwork so no joint runs the full height. Lapping the corners log-cabin style is much stronger and looks better.

  5. Sink the first course where it matters

    On edging and walls, setting the bottom course 1 to 2 in into the base stops it being kicked out of line and hides small bumps in the ground. On walls many builders bury the first course to about half its height.

  6. Lean a retaining wall back into the slope

    Step each course back slightly into the bank, roughly half an inch per course or about an inch per foot of height. The wall then works with gravity, and if it settles a little it still looks upright rather than tipping out.

Sawing

Cutting timbers safely and square

A 6x6 is deeper than a circular saw will cut in one pass, so almost every cut takes two to four passes. Take your time and the end will be square; rush it and you get a stepped face that never closes up at the corner.

  1. Support the timber properly

    Two sturdy sawhorses or blocks under it, with the offcut supported as well as the piece you are keeping. An unsupported offcut pinches the blade as it drops, and that is how kickback happens. Never cut a timber lying on the ground or pinned under your foot.

  2. Mark all four faces

    Use a speed square or rafter square to carry the line right around. You will cut from more than one side, and lining the second cut up with the first is what keeps the end flat.

  3. Set the saw to full depth and cut the first face

    A 7¼ in circular saw cuts about 2½ in deep. Cut cleanly along the line all the way across, then stop.

  4. Roll the timber and repeat

    Turn it to the opposite face, line the blade up with the first kerf and cut again. Two passes nearly get through a 6x6; four (one per face) cleans it up.

  5. Finish the center with a reciprocating saw or handsaw

    There will often be a small uncut core. A reciprocating saw with a long wood blade, or a sharp handsaw, finishes it in a minute, guided by the kerfs either side. A big beam saw or chain saw is an option, but a chain saw cut is rarely square.

  6. Check used timbers for metal before every cut

    Old ties and beams hide spikes, bolts and nails. Run a metal detector or magnet along the cut line, or at least inspect and probe it. Hitting steel at speed wrecks the blade and can throw the saw.

  7. Treat the cut ends straight away

    Brush end-cut preservative onto every fresh cut before the piece goes into place. Pressure treatment does not reach the center of a big timber, and the cut exposes untreated wood exactly where water collects.

Protection is not optional here. Safety glasses and hearing protection always; a dust mask whenever you cut treated lumber, and a respirator for anything creosoted. Work outdoors, upwind, and keep sawdust from blowing onto a vegetable bed or into a pond. Sweep up treated sawdust instead of leaving it on the soil, and never burn treated or creosote scraps in a fire pit or stove.

Holding it together

Fastening landscape timbers securely

There are four common methods, and they do different jobs. Most projects use two together: something that holds the courses to each other, and something that holds the whole thing to the ground.

Structural timber screws

The default for almost all timber work. Long hex- or Torx-drive screws, typically 6 to 10 in, driven through one timber into the one below or beside it. They have largely replaced the old 10 to 12 in galvanized spikes, which still work for light edging but loosen over time.

  • Best for Joining courses, corners, benches, steps, raised beds: almost everything
  • Sizing The screw should go through the top timber and bite at least 3 in into the one below; for 6x6s that usually means 8 to 10 in screws
  • Pre-drill a clearance hole through the top piece and a smaller pilot into the lower one. It stops splits and snapped screws
  • Two per joint minimum, set well in from the ends and offset from each other so they do not follow the same grain line
  • Use screws rated for treated lumber; the copper in modern treatment eats ordinary zinc-plated screws and leaves black streaks down the face

Rebar driven into the ground

The method that ties a timber structure to the earth rather than just to itself. A length of 1/2 in (#4) rebar is driven down through a pre-drilled hole in the timber and well into the soil below.

  • Best for Stopping edging, steps and low walls from sliding or creeping downhill
  • Lengths 2 to 3 ft is typical, with at least 12 in in undisturbed ground
  • Drill first with a bit slightly larger than the bar (9/16 in for 1/2 in rebar), then drive with a small sledge
  • Sink the end flush or below the surface, or counterbore, so nothing sticks up where people walk, and cap any exposed ends
  • Two per timber on edging and steps; more on anything holding back soil

Posts set in concrete

The proper answer for anything holding back real soil. Posts are set in concrete and the timbers are fastened to them, so the load goes into the footing instead of into a stack of loose wood.

  • Best for Retaining walls over about 1 ft, and any wall on a slope
  • Position Behind the timbers (hidden, on the soil side) or in front (visible, simpler); behind looks neater but is harder to build
  • Spacing Typically every 4 ft or so, and at every joint
  • Depth A common rule is a third to half of the post in the ground, and below your local frost line so frost cannot jack the posts up
  • Use ground-contact (UC4B) posts and let the concrete cure before you backfill

Brackets, threaded rod and deadmen

Useful extras rather than a main method, but each solves a particular problem neatly.

  • Corner brackets Galvanized or coated angle brackets inside a raised bed corner add a lot of stiffness for very little money
  • Threaded rod A length of rod right through two opposite sides of a deep bed, with washers and nuts, stops the sides bowing out
  • Hidden dowels Short lengths of rebar or wood dowel locate courses neatly, but they locate rather than fasten
  • Deadmen A short timber buried back into the slope at right angles, fastened to the wall and tied to a crosspiece, resisting the push. The traditional answer for timber retaining walls

A simple rule for most projects. Screws hold the timbers to each other; rebar or posts hold the whole thing to the ground. Screws alone make a rigid box that can still slide, tip or be lifted by frost; ground anchors alone let the courses shift against each other. Both together is what stays put.

Putting it together

The build, in order

For a typical two-course 8 by 4 ft raised bed in 6x6 timbers. Most of a day for two people, including the base.

  1. Morning: utilities marked, layout checked

    With 811 marks in place, set the string, square the corners and confirm both diagonals match before you dig.

  2. Morning: dig out sod and topsoil

    Strip sod and topsoil under the timber line and pull perennial weed roots. Dig deep enough for the base plus any burial of the first course.

  3. Midday: base in and compacted

    Crushed gravel in layers, tamped, then a thin leveling layer screeded flat. Check level both ways.

  4. Midday: make the cuts

    Cut the end timbers to length, marking all four faces and working around. Brush preservative on every cut end and let it soak in while you carry on.

  5. Afternoon: first course down and leveled

    Set the first timber perfectly, then work around, checking level and square at every corner. Pin each one to the ground with rebar.

  6. Afternoon: second course, joints overlapped

    Lap the corners over the course below, pre-drill, and drive structural screws down into the first course, two per joint, well in from the ends.

  7. Finish: loosen the bottom, then fill

    Break up the soil inside the bed with a fork so it drains, then fill. Stop about 2 in below the top of the wood so soil does not wash over the edge when you water.

On the job

The installation checklist

Fifteen checks across the build. Your ticks are saved in this browser only.

Before you start

Base and drainage

Timber and fasteners

Installation questions

Installing landscape timbers: frequently asked questions

Do landscape timbers need a gravel base?

It depends on the job. A single course of flower-bed edging can sit on firm, level soil with the sod removed. Anything two courses or more, and all steps, benches and retaining, wants 3 to 6 inches of compacted crushed gravel with a thin leveling layer on top. The base stops uneven settling, and in cold regions it drains water away so frost heave has less to work with. Uneven settling is what pulls corners apart and tips steps forward.

How do you fasten landscape timbers together?

Use structural timber screws, typically 6 to 10 inches long with a hex or Torx drive, pre-drilled and driven through one timber into the next, two per joint and well in from the ends. That holds the courses to each other. Separately, drive 1/2 inch (#4) rebar down through the bottom course into undisturbed ground, or fasten to posts set in concrete, to hold the whole thing to the earth. Most projects need both. Galvanized landscape spikes work for light edging.

How do you cut a 6x6 landscape timber?

Support it on two sawhorses or blocks with the offcut supported too, square a line around all four faces, then cut with a circular saw set to full depth, one face at a time, rolling the timber and lining each cut up with the last kerf. A standard 7 1/4 inch saw cuts about 2 1/2 inches deep, so a 6x6 takes cuts from two or more sides; finish any center with a reciprocating saw or handsaw. Check used timbers for spikes first and treat every cut end.

What do you put under landscape timbers?

For anything beyond one decorative course, compacted crushed gravel (often sold as 3/4 inch minus, crusher run or paver base) with a thin leveling layer on top. It gives a firm, level bed and drains, which keeps the underside of the wood out of standing water. Do not set timbers straight onto sod, which rots and lets them sink unevenly, and do not bed them on solid concrete with nowhere for water to go.

How deep should the first course of timbers be buried?

For edging and the bottom course of a low wall, about 1 to 2 inches into the compacted base is usually enough to stop it being knocked out of line, and some builders bury the first course of a wall to half its height. There is no benefit in burying wood deeply, because more buried wood means more wood sitting in wet soil. What holds it in place is the rebar or posts, not the depth.

What screws should I use for landscape timbers?

Structural timber screws 6 to 10 inches long with a hex or Torx head, coated and rated for use in pressure-treated lumber. Pre-drill a clearance hole through the top piece and a pilot into the one below, or you may split the wood or snap screws. Avoid ordinary bright or zinc-plated screws: the copper in modern treated lumber corrodes them fast and they leave black streaks down the face.

Do I need drainage behind a timber retaining wall?

Yes, and it is the most important detail. Backfill at least 12 inches directly behind the wall with clean crushed stone, separate it from the soil with filter fabric, and run a perforated drain pipe along the base, sloped to somewhere it can actually discharge on your own property. Water trapped behind a wall adds a great deal of pressure, and in cold regions it freezes and heaves; it is the usual reason timber walls fail.

How do you stop a timber raised bed from bowing out?

Keep unbraced runs to about 6 ft, overlap the joints between courses, and screw the courses together properly. On a bed three courses or taller, or a longer run, add cross-bracing: a length of threaded rod through both long sides with washers and nuts, or a timber set across the bed below soil level. Wet soil pushes harder than people expect, and frozen soil harder still.

Where to go from here

The next steps