How to Install Landscape Edging: Layout, Height and Staking
The box in the home improvement store makes edging look like a one-hour job, and the method barely changes from one material to the next. What decides whether it is still straight after a few winters is the same every time: a clean line laid out with care, a firm base, a finished height chosen on purpose, and enough anchoring that frost and mowers can't move it. Do those well and a cheap wood board outlasts a costly steel edge that was rushed in.
General guidance for American yards. Call 811 a few days before you dig or drive stakes, wear eye protection when cutting, and get advice where an edge is also holding back soil. Part of the PlantMapper Landscape Edging section.
The finished height decides whether an edge saves work or makes it · photograph via Pexels
Before you start
Four things, whatever you install
For a short run of plastic or wood, edging really is a quick Saturday job with a spade and a mallet. The difference between an edge that still looks crisp in five years and one that wanders, heaves and pops up is less about effort than about doing things in the right order.
The four steps are: lay out the line and live with it before you dig; build a firm base, because edging on soft soil sinks unevenly; set the finished height on purpose instead of following the ground; and anchor it with enough stakes, spikes or concrete backing that nothing moves, including through freeze and thaw in colder zones.
This guide walks through all four, then the method for each material. If you haven't picked a product yet, start with Edging Materials.
What you need
Tools and materials
✓Tools
Flat spade and a half-moon edger, which cuts a much cleaner trench wall than a round-point shovel
String line and stakes for straight runs; a garden hose or marking paint for curves
A 4-foot level and a straight board
Rubber mallet and a small sledge, plus a scrap of 2x4 to protect the edging as you drive it
Hand tamper for firming the trench bottom
Angle grinder or hacksaw for metal; a saw for wood; a masonry saw or brick chisel for brick and pavers
Wheelbarrow and mixing tub if you are setting pavers in mortar or concrete
Gloves, safety glasses and knee pads; cut steel edges are genuinely sharp
!Materials
Edging, plus 10 percent for cuts and overlaps
Stakes or spikes, far more than the box suggests
Crushed stone base (¾-inch minus) or coarse sand for the trench bottom
Mortar mix or bagged concrete for brick, pavers and stone set as a mow strip
Concrete for a backing wedge behind a hard edge
Cut-end preservative for every cut in pressure-treated wood
Hot-dipped galvanized or coated exterior screws for wood; never plain steel
Topsoil and grass seed or sod to patch both sides afterward
As an Amazon Associate, PlantMapper may earn from qualifying purchases. Prices and availability are set by Amazon. Settle the line and the height before you anchor anything, because edging is hard to adjust once it is staked.
Step one
Laying out the line
The cheapest ten minutes of the job. Once the trench is cut, the line is set, and you will look at it every day.
Mark it, then leave it for a couple of days
Use a string line for straight runs and a garden hose or marking paint for curves. Then walk away. Look at it from the front walk, the kitchen window, an upstairs window and the far side of the yard before you commit. Curves especially look different from above than they do when you are standing over them.
Keep curves few and generous
One long sweep looks designed; four small wiggles look like a mistake. If a curve looks awkward on the ground, it will look worse once it is permanent.
Make sure straight runs are actually straight
Pull a line tight between two stakes and check a third against it in the middle. On a rectangular bed, measure both diagonals; if they match, it is square.
Think about the mower
Where the edge meets lawn, check that a mower can follow the line without backing up. Very tight inside curves and sharp inside corners are where you end up string trimming forever.
Call 811 first
Edging trenches are shallow, but stakes and rebar spikes go deeper. Call 811 a few days ahead so public utilities are marked, and find private lines yourself: irrigation pipes, downspout drains, low-voltage landscape lighting cable and any power run to a shed.
Step two
Trench and base
How much base an edge needs depends on what it holds back and what rolls over it.
Trench depth and base by edging type, measured below the finished surface beside the edge. In cold zones, a free-draining crushed stone base helps resist frost heave.
Edging type
Trench depth
Base
Notes
Steel or aluminum strip
Slit only, 4-6 in for the strip
Firm, undisturbed soil
Cut a slit with a spade in hard ground; the stakes do the rest
Wood board on stakes
4-6 in
Firm soil, or 1 in of coarse sand
Stakes go into undisturbed soil below the trench
Plastic or composite strip
3-4 in, or most of its depth
Firm soil
Stake closely; plastic needs about twice what the box says
4 in compacted crushed stone + 1 in sand, or a mortar bed
Plus a concrete backing wedge, or plastic paver restraint spiked in
Precast concrete edging
6-8 in
4 in compacted crushed stone
Back both sides beside a driveway
Mow strip (brick or pavers laid flat)
6-8 in
4 in compacted crushed stone + sand or mortar bed
It carries a mower wheel, so it must not shift
Cut the trench cleanly
A half-moon edger gives a far sharper line than a shovel, and a sharp trench makes every later step easier. Cut both walls of the trench before you lift any soil.
Get the grass and roots out
Runners left in the trench grow back through and under the new edge within a season, and Bermudagrass and zoysia are especially persistent. Lift the sod, shake the soil out and remove the roots and rhizomes.
Firm the bottom
Even for a wood board, tamping the trench bottom stops the edge settling over its first winter. For anything set in mortar, spread and compact the crushed stone properly before you start.
Save the soil
You will need it to backfill both sides once the edge is in. Pile it on a tarp instead of scattering it.
Step three
Setting the finished height
This is the choice that decides whether the edge saves work or creates it. Make it with a level and a string line, not by eye as you go.
Flush with a lawn
The mower-friendly choice
The top of the edge sits level with the soil at the base of the grass, or about ¼ inch below, so the mower wheel rolls right over it.
Set a string line at soil height and work to it along the whole run
Err a little low, especially beside new sod, which settles
Check across the edge as well as along it; a tilted edge shows badly
Raised, to hold a surface
1½-2 in above the loose material
For gravel, decomposed granite or mulch, the edge must stand above the surface or the material washes or gets kicked over.
Measure from the finished gravel or mulch, not from the base
Allow for settling of about ¼ to ½ inch in the first year
Make it clearly raised, not barely, if people walk beside it
On a slope
Follow it or step it, never drift
A long edge on sloping ground has to make a choice, and the wrong one is easy to see.
Follow the grade at a steady depth for an informal edge
Or step down in equal amounts for a formal one; equal is what matters
Never let it drift, staying level for yards then dropping suddenly
Meeting hard surfaces
Nothing sticks up where people walk
Where the edge meets a walkway, a patio or the driveway, nobody should be able to catch a foot or a snow shovel on it.
Flush with the paving, or just below it
Keep soil and mulch well below siding, and keep the grade sloping away from the foundation
Don't run an edge across a walkway at all if you can route around it
Step four
Installing and anchoring each type
The method for each common material. The principle never changes: something has to hold the edge down and something has to keep it in line.
Steel and aluminum strip
The fastest to install and the least forgiving of a sloppy line, because a kink in
metal edging shows for good.
Cut a guide slit along the string line with a spade first so the
edging follows it instead of wandering
Drive the stakes, not the edging. Use the stake slots or clips supplied;
pounding the top of a steel strip flattens and flares it
Protect the top with a scrap of 2x4 if you must strike it directly
Stake every 2-3 feet on straight runs and every
12-18 inches on curves, where the strip wants to spring back
Overlap sections as the maker specifies, often about 4 inches, and
pin or clip them; a butt joint opens up
Use rolled-top or safety-cap edging beside lawns and play areas, file any cut ends, and turn them toward the bed, not the lawn
Wood boards and landscape timbers
Cheap, forgiving and quick, as long as it is staked properly. Too few stakes is the
one mistake that matters.
Use pressure-treated lumber rated for ground contact, or naturally rot-resistant cedar or redwood
A stake every 3 feet and at every joint, driven into undisturbed soil
below the trench, not into loose backfill
Stakes on the bed side so they don't show, cut flush with the top of
the board
Fasten with hot-dipped galvanized or coated exterior screws; plain steel
corrodes in treated lumber and leaves black streaks
Butt joints over a stake, so both boards share the same fastener
Brush preservative on every cut end before it goes in the ground; cut ends are where rot starts
Pin landscape timbers with 12- to 18-inch rebar spikes through predrilled holes. Old railroad ties treated with creosote don't belong beside vegetable beds or play areas
Brick, pavers and natural stone
More of a small masonry job than a gardening one, and the result lasts decades.
Take your time on the first few feet and the rest follows.
4 inches of compacted crushed stone, then either 1 inch of
coarse sand (dry-laid) or a mortar bed of about 1½ inches
Set a string line at the finished top height and work to it, tapping each
unit down with a rubber mallet
Back it with concrete (a wedge of mix against the back face,
below the finished soil), or spike plastic paver restraint along a dry-laid run. Without it the row slowly tips outward
Keep joints even, about ¼ to ⅜ inch, and sweep in polymeric sand
or point them with mortar
Cut with a masonry saw or brick chisel, wearing eye and ear
protection and a dust mask
Let mortar cure for a day or two before backfilling hard against it
Precast concrete edging and poured curbing
Heavy, strong and the right choice where an edge takes weight. Precast pieces go in
much like pavers, but they are large enough that height matters more.
Set precast pieces on compacted crushed stone, with a mortar bed where they take traffic
Back both sides beside a driveway or anywhere a car crosses; one side is
enough beside a garden path
Check level along and across each piece as you set it; a tipped
concrete edge is obvious from the street
Leave an even joint, or the pieces chip against each other
Poured curbing is usually a contractor job: a machine extrudes a continuous concrete curb that follows any curve, with control joints cut every few feet to manage cracking
Plastic strip and composite board
Two different products with two different methods. Composite behaves like wood;
plastic needs far more anchoring than the box suggests.
Plastic: stake at half the stated spacing, about every 12 inches, because
it moves as it heats and cools and frost heave lifts it
Plastic: bury more than you think, at least two thirds of its
depth, leaving only the rounded top showing
Composite: stake like wood, about every 3 feet and at every joint, with
stainless or coated screws
Warm plastic in the sun before bending it into a curve; cold plastic kinks
Leave a small expansion gap at joints on long runs of either; both
move noticeably between a July afternoon and a January night
Stakes go into undisturbed soil, not loose backfillAn edge holding loose stone has to stand above itBrick or pavers laid flat and level make a mow strip
The tricky bits
Curves, corners and joints
Straight runs mostly take care of themselves. These three details are where edging jobs fall apart.
✓Curves
Cut the guide slit first and let the edging follow it, instead of bending the strip into place freehand.
Halve the stake spacing on a curve; metal wants to spring back straight and will at the weakest point.
Work from the middle of the curve outward, anchoring as you go.
Warm plastic and composite in the sun before bending; cold material kinks instead of curving.
For brick and pavers, open the outside of each joint slightly rather than cutting wedges; up to about ⅜ inch looks normal.
!Corners and joints
Overlap metal sections by the stated amount and pin or clip them; a butt joint opens within a year.
Land every wood joint on a stake so both boards share the fastener.
Miter or butt outside corners in wood, then stake both sides of the corner; corners take the most abuse.
Leave an expansion gap of about ⅛ inch at joints in long plastic and composite runs.
Don't force a tight inside corner in strip edging; cut it and make a deliberate joint instead.
Water
Drainage as you install
Most edging has no effect on drainage at all. The exceptions are worth catching before any concrete goes in.
Drainage points to watch while installing edging.
Situation
What can go wrong
What to do
A solid edge across a slope
It dams water that used to flow across, and a puddle forms uphill
Use pavers or brick with open joints, or leave a deliberate low gap in the run
Concrete backing on heavy clay
Water is trapped under and behind the edge, then freezes and heaves it
Set the edge on crushed stone, keep any concrete backing small and below finished grade
Edging or beds against the house
The edge traps water against the foundation or raises soil up the siding
Keep the grade sloping away from the house and soil well below siding and weep holes
A walkway lower than the bed beside it
Soil and mulch wash onto the walk in every storm
Keep the bed surface 1½-2 in below the top of the edge
For a typical 40-foot curved steel edge between lawn and flower bed: about half a day for one person. A brick or paver mow strip of the same length is a full day or two.
Mark the line and live with it
Garden hose or marking paint, viewed from the house and from upstairs. Adjust until it looks right from the places you actually stand.
Call 811, then cut the guide slit
Once utilities are marked, cut a clean slit along the line with a spade or half-moon edger, about 4 inches deep.
Set the height reference
Run a string line at the finished top height, staked at both ends and checked in the middle. For a flush lawn edge, that is soil height or just below.
Set the first piece and stake it
Start at one end, seat the strip in the slit, check it against the string and drive the first two stakes. Everything else lines up from this piece.
Work along, staking at the right spacing
2-3 feet apart on straight runs, 12-18 inches on curves. Overlap and fasten each joint before moving on.
Check the whole run before backfilling
Sight down it from both ends. Metal shows every kink, and this is the last easy chance to fix one.
Backfill, firm and clean up
Put topsoil back on the bed side, firming it in layers so it doesn't slump. Trim the lawn edge neatly, patch any gaps with seed or sod and water both sides.
On the job
The installation checklist
Fifteen checks from start to finish. Your ticks are saved in this browser only.
Before digging
Trench and height
Anchoring and finishing
Installation questions
Installing edging: frequently asked questions
How deep should landscape edging be installed?
Deep enough that it can't be kicked or pushed out of line, and deep enough to block grass runners. Edging buried 4 to 6 inches stops most lawn grasses; with Bermudagrass or zoysia, go to the deeper end. As a guide: steel and aluminum are driven into a slit and held by their stakes; a wood board wants a 4- to 6-inch trench; brick, pavers and precast concrete want 6 to 8 inches to allow for a crushed stone base and a sand or mortar bed. Bury plastic strip to at least two thirds of its depth.
How far apart should edging stakes be?
For steel and aluminum, every 2 to 3 feet on straight runs and every 12 to 18 inches on curves, because the strip wants to spring back straight. Wood boards want a stake about every 3 feet and at every joint. Plastic edging needs roughly one every 12 inches, about twice what the box suggests, because it moves with heat and cold and frost heave lifts it.
Do I need concrete under landscape edging?
Only for the hard materials, and not always then. Brick, pavers and stone are set on compacted crushed stone and either backed with a wedge of concrete or held with spiked plastic paver restraint, because without that backing the row slowly tips outward. Steel, aluminum, wood, composite and plastic need no concrete at all; they are held by stakes driven into undisturbed soil.
Should edging be level with the lawn or above it?
Level, if you want the mower to roll over it so you can skip string trimming, which is the usual choice between lawn and flower bed. Clearly raised, 2 inches or more, if the edge holds gravel or mulch or you want it to stand out as a feature. Avoid anything about ½ to 1½ inches proud, which catches mower blades and toes without being easy to see.
How do you install edging on a curve?
Cut a guide slit along the marked line first and let the edging follow it, rather than bending the strip into place freehand. Halve the stake spacing compared with a straight run, work outward from the middle of the curve, and warm plastic or composite in the sun before bending. For brick or pavers, open the outside of each joint by up to about ⅜ inch rather than cutting wedge-shaped pieces.
Why does my edging keep popping out of the ground?
Usually too few stakes, or stakes in the wrong place. Drive them into undisturbed soil below the trench rather than into loose backfill, use more than the instructions suggest and add extras at joints, corners and curves. In colder zones frost heave pushes poorly anchored edging up each winter, and plastic also creeps as it expands and contracts, so bury more of it and stake it about every 12 inches.
Can I install edging in winter?
Steel, aluminum, wood, composite and plastic, yes, as long as the ground isn't frozen or so soggy the trench collapses. In warm zones winter is often a good time. Don't set brick or pavers in mortar or concrete when temperatures will drop below freezing, because mortar that freezes before it cures never reaches full strength. In cold zones, do strip edging in fall before the ground freezes and save masonry for spring.
How long does it take to install landscape edging?
A 40-foot run of steel or wood edging takes one person about half a day, including layout and cleanup. The same run as a brick or paver mow strip, with a crushed stone base, setting bed and concrete backing, is a full day or two. Layout and digging the trench take most of the time either way; the edging itself goes in quickly.